(Joint Stock Company with capital 200 Million Egyptian Pound)
|
 |
|
The Chairman Mr. Samir Halabeia explain to HE Mr. Mamdouh Al Beltagy the Egyptian minister of tourism the component of Blue Bay resort which located in Ras Sudr area
We choose Ras Sudr area to establishing our first resort (Blue Bay Resort) because of its marvelous advantage of the location.
|
|
|
Ras Sudr -Sinai
|
 |
|
Situated some 190-km far from Cairo and 45 kms
from Ahmed Hamdi Tunnel,
which connects mainland Egypt to Sinai, and is the second most important town on the Gulf
of Suez after El-Tor. However, there are a number of resorts growing up around the town,
and these have become popular retreats for residents of Cairo. Oyun Musa is located about
20 km north of Ras Sudr. It is believed that this is the springs of Moses. Moses is said
to have, upon the advice of God, thrown a special tree into the brackish water that made it
drinkable. Today the spring is still brackish, and there is no tree in sight, but seven of
the original 12 springs still exists. During the Egypt Expedition there were nine springs
still active. At one point during the 19th century, this, the largest of the Sinai Oases,
became a popular retreat for foreign diplomats. In present, Ras Sudr is an floating type
berth oil loading terminal situated on Sinai Peninsular.
In Ras Sudr wind surfing still. might be a so nice choice.
The wind blows constantly all the year long, make it a good
spot for such an activity. Laying down on the beach might be your second one.
|
|
|
Blue Bay resort In Words
|
 |
|
It is the biggest tourism village in Ras-Sudr area
On the beach of Red Sea.{90 Km Far from the Ahmed Hamdy tunnel (under the Suez Canal)
on the way to Sharm El-sheikh}
The village area 2 100 000 M2
The village under construction and it is now in the first stage, which contain the following:
|
|
HOTELS PART which contain:
" Five stars hotel which contain :
The Hotel main building which contain:
A.
1. 52 room
2. 8 sweat
3. 4 presidential sweat
4. maim restaurant ( 300 persons )
5. Italian restaurant ( 200 persons )
6. Lobby bar & cafeteria
7. Bar & coffee shop
8. 2 multi purpose large halls
9. 5 commercial shops
10. reception hall
11. 2 swimming pools ( 1000m3 & 7000 m3 ) sweet water
12. child swimming pool
B.
Separate private residence, which contain:
1. 275 hotel rooms
2. 81 shale ( bedroom & hall )
3. 12 villa ( 3 bedrooms )
4. 5 villa ( 5 bedroom )
C.
Entertainment service's buildings which contain:
1) Health care club :
Covered swimming pool with possible of hot water.
2 sauna rooms.
2 Jacuzzi baths.
4 lines pooling hall.
4 peliardo tables.
Cafeteria
2) International conference center.
3) Playgrounds :
3 tennis playground.
2 squash playground ( separate private building )
Football playground ( international measurements )
Child game yard.
Patinage yard
4) Emergency health unit.
5) Bank.
6) Tourism development authority administration office.
7) Village administration office.
D.
Entertainment center which contain:
1) Three star hotel with ( 200 ) rooms + separate
lobby building contain the reception and
restaurants .
2) Commercial mall contain 64 shops + 2 restaurants .
3) Swimming pool.
4) 2 cafeterias.
5) Horses and camels riding area + separate horse home.
6) Roman open theatre ( 3000 person )
7) Diving center and sea sports area.
8) Mosque (500 prayers).
9) Yachts marina.
E.
2 swimming pools + 5 water flash pumps +
gardens and green areas.
F.
The village services
Electric stations (6 megawatt).
Seawater ventilation station - capacity 500 m3/day.
Treatment station.
Automatic irrigation net.
Washing machine with all attachments.
2 steam boilers with 3ton capacity.
Storehouses.
Securities.
G.
Central air condition system for main hotel building :
Water cooling ( 3 units carrier with capacity 150
ton )
Water pump ( 3 pumps with capacity 360 gallon / min)
94 FCU carrier
H.
HOUSING PART ( in use ) which contain :
1) 76 villa item ( C ) 230 m2 .
2) 39 shale item ( D ) 130 m2 .
3) 301 shale item ( E ) 90 m2 .
4) 243 shale item ( F ) 65 m2 .
I.
Diplomatic Area (Palaces) which contain:
1) 11 palace item (A) 1200 m2 building 500 m2.
2) 24 palace item (C) 450 m2 building 230 m2.
3) 8 palace item (G) 1800 m2 building 400 m2.
85 % from the total works in the first stage was finished.
All woks for the first stage just on 25% from the total
village area and the other land for the extension and the
following stages.
|
|
Blue Bay resort In pictures
|
|